Guide To Stored Program Control Switching
Bookreader Item Preview
Share or Embed This Item
- Publication date
- 1975
- Topics
- AT&T, Western Electric, Bell System, ESS, 1ESS, 2ESS, 4XB
- Collection
- opensource
- Language
- English
- Item Size
- 875.8M
A guide distributed to AT&T Plant Division employees maintaining Stored Program Control telephone switches such as the #1 and #2 ESS as well as their interfacing with systems such as the #4 Crossbar.
An important detail with this guide is that each "page" except for the cover and its back consists of three separate flip decks. The intent of the guide is to flip the decks independently of one another to establish a visual representation of a particular switching scenario, for instance a #1 ESS exchange through standard interoffice facilities to a #2 ESS exchange.
The date of this posting is given as 1975 but no date is visible on the materials. The cover motif suggests a production date sometime in the 1970s.
- Addeddate
- 2024-01-04 04:48:14
- Identifier
- guide-to-stored-program-control-switching
- Identifier-ark
- ark:/13960/s25fsqm9wzv
- Ocr
- tesseract 5.3.0-6-g76ae
- Ocr_detected_lang
- en
- Ocr_detected_lang_conf
- 1.0000
- Ocr_detected_script
- Latin
- Ocr_detected_script_conf
- 0.8261
- Ocr_module_version
- 0.0.21
- Ocr_parameters
- -l eng
- Page_number_confidence
- 86
- Page_number_module_version
- 1.0.3
- Pdf_module_version
- 0.0.23
- Ppi
- 600
- Scanner
- Internet Archive HTML5 Uploader 1.7.0
comment
Reviews
423 Views
DOWNLOAD OPTIONS
For users with print-disabilities
IN COLLECTIONS
Community TextsUploaded by segaloco on
Open Library